Building intelligence, organised.
New to the workspace? Follow these four steps.
You do not need to complete everything at once. Start with the building details, then add inspection notes as you go.
Project portfolio
| Asset / project | Type | Stage | Priority |
|---|
Delivery workflow
v1.0Separate observed facts, technical interpretation and recommendations. Do not convert missing information into assumed compliance.
Projects & assets
Registered buildings
2 records| Project | Building type | Location | Stage |
|---|
Add a building
Step 1Inspection suggestions for this building
Select a registered building. Its construction year will be matched to the Danish typology library to suggest what to verify before and during inspection.
Register a building and enter its construction year to see tailored inspection suggestions.
Site checklist
Register a building with its construction year to see inspection priorities here.
Choose a part of the building
Select an area on the drawing or use the buttons. The checklist below will show the relevant items.
Choose a building area
Select an area above to see practical questions and evidence to collect.
Typical warning signs
Inspection checklist
Inspection protocol
Measurement register
New measurement
Diagnostic review
Select a saved result from the register below. The review brings together the instrument's purpose and limitations with the conditions and assessment you recorded.
Your review will appear here
Save a measurement, then select “Review” beside it to inspect the record.
Recorded measurements
| Date / ID | Building / location | Parameter | Reading | Instrument | Assessment | Review |
|---|---|---|---|---|---|---|
| No measurements recorded yet. Use the form above to add the first result. | ||||||
Platform, security & deployment
Cloudflare Pages Free + GitHub Free
Publish the app shell at no monthly cost while keeping all project records local to each device.
One workspace · several secure services
The interface stays simple. Data, access control, file handling and synchronisation sit behind it.
iPhone installable PWA
Offline working view
API and permissions
Input validation
Sync queue
The hosting region must be confirmed for the primary database, document store, backups, logs and support access. “EU hosting” must cover the full data flow, not only the web server.
Appwrite Cloud · Frankfurt (FRA)
The proposed managed stack for when shared projects, secure client records, multiple users and cross-device synchronisation are commercially justified.
Security model to implement
Proposed PostgreSQL record groups
Core project data model
| Record group | Purpose | Relationships |
|---|---|---|
| Organisation & users | Company tenancy, user identity and membership. | Users receive roles within an organisation and project. |
| Projects & assets | Client, instruction, property, building and components. | One project can contain multiple buildings and assets. |
| Inspection evidence | Checklist, observations, photographs and measurements. | Each record belongs to a project and, where applicable, a building component. |
| Technical assessment | Analysis, risks, confidence, actions and recommendations. | Assessments cite the records and evidence on which they rely. |
| Investment planning | Work packages, cost ranges, scenarios and assumptions. | Measures can link to findings, risks and asset components. |
| Documents & evidence links | File metadata, revisions, reviews and source references. | Files are stored separately; links connect them to findings and conclusions. |
| Reports & audit history | Report versions, sign-off, issue status and event history. | Issued reports retain a snapshot of their source records and revision. |
Proposed user permissions
| Role | Typical access |
|---|---|
| Organisation owner | Manage organisation, billing, users, projects, security settings and all records. |
| Project administrator | Create projects, invite team members, assign roles and manage project records. |
| Engineer / inspector | Create and edit assigned project records, upload evidence and draft reports. |
| Technical reviewer | Review evidence, calculations, risks and report versions; record QA sign-off. |
| Client viewer | Read only the selected, issued deliverables and specifically shared documents. |
Controls required before client data
Questions to resolve before hosting
How synchronisation should work
The user should be able to inspect and record information in the field, even when mobile connectivity is poor.
Deployment-readiness checklist
Tick an item only after it has been configured and independently verified. This is a planning checklist, not an automated security test.
Documents & evidence
Upload a document
Keep the original filename. Add the type, revision and source so another reviewer can identify the document later.
Document review
Mark whether the document is relevant, contains an issue or does not apply. Add the page, drawing number or section when useful.
Document register
The selected project is shown below. Superseded versions remain in the register for audit history.
| Document / file | Category | Revision / dates | Version state | Review status | File |
|---|---|---|---|---|---|
| No documents registered for this project yet. | |||||
Document request list
Record what is needed, why it matters and who should provide it.
Information request register
| Requested information | Priority / due | Status |
|---|---|---|
| No information requests recorded. | ||
Evidence links
Link a source document to a finding, measurement or calculation. Enter the page, drawing number or section yourself; the application does not extract these references automatically.
| Source document | Linked record | Source reference | Technical note |
|---|---|---|---|
| No evidence links recorded yet. | |||
Analysis workspace
Choose what you need to assess
Each tool handles one defined calculation. You can return to the measurement register to review the original field data.
Result & interpretation
Saved analysis records
| Date | Building | Analysis | Key result | Basis |
|---|---|---|---|---|
| No calculations saved. Calculate a result and select “Save to project record”. | ||||
Findings & observations
Recorded observations
4 records| ID / component | What was seen | Severity | Photos | Next step |
|---|
Add an observation
Step 3Attach inspection photographs
Optional evidenceRisk & investment analysis
Risk register
Every observation starts as a draft screening score. Select “Review” to enter a project-specific assessment.
| Finding / issue | L | C | Score | Confidence | Priority |
|---|
Review a risk
Assess the credible technical consequence, not only how visible the defect looks.
Use the same scale consistently
Renovation & investment scenarios
Build three packages using cost ranges and explicitly stated benefits. Assign each work package to the scenario in which it belongs.
| Scenario | CAPEX low | Base estimate | CAPEX high | Annual saving | Simple payback |
|---|
Add an investment measure
Link it to a finding where relevant. Enter a range when the scope is uncertain.
Scenario work packages
Review the measures assigned to each scenario. Remove or revise a package when its basis changes.
| Measure / linked risk | Scenario & timing | CAPEX range | Annual saving | |
|---|---|---|---|---|
| No work packages entered yet. Add a measure to compare scenarios. | ||||
Future building costs
CAPEX schedule
Illustrative DKK| Component / work | Timing | Allowance | Basis |
|---|
Costing assumptions
Client report builder
Prepare the client document
Choose the building and complete the report details. The preview below refreshes when you build the report.
Equipment & diagnostics
Start with the question you need to answer
The same instrument can be useful in different investigations. This guide helps you compare possible tools, understand what they can and cannot tell you, and decide when a specialist or laboratory is needed.
Select a tool to see how it is used
Each tool includes its purpose, useful applications, practical limitations and field notes.
How to choose the right instrument
Measurement quality & safety
Methodology & quality assurance
Building typologies & common defect patterns
Start with the approximate construction period and building type. Select a period to see common construction patterns, what to inspect and which investigations may help. These are working hypotheses for planning an inspection — not a diagnosis of an individual building.
Choose a period card to explore
You will see typical construction, possible defect mechanisms, inspection priorities and practical next steps here.